My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-17_REVISION - M1983013
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983013
>
2011-02-17_REVISION - M1983013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:25 AM
Creation date
2/25/2011 12:47:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983013
IBM Index Class Name
REVISION
Doc Date
2/17/2011
Doc Name
FW increase (SI-02)
From
DRMS
To
Lafarge West, Inc.
Type & Sequence
SI2
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name: DRMS <br />Task # : 01a State : Colorado Permit/job #: M-1983-013 <br />Date : 02/17/2011 County: Rio Blanco Abbreviation :none <br />User : THM Site :Latham-Burkett Pit Filename :M013-01a <br />Permit or other job action :Final Reclamation Cost Estimate Update <br />Task description :Replace 4033cy of topsoil around area surrounding ponds <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />(Equipment Description <br />Scraper work team -Scraper : Cat 627G <br />-Push dozer : Cat D8R Series 11 - 8SU (2005) <br />Cost Bre <br />Support equipment -Load area :NA <br />-Dump area : Cat D8R Series 11 8SU (2005) <br />Road maintenance -Motor grader : NA _ <br />-Water truck : Water Tanker, 3,500 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 dozer NA dozer NA misctruk <br />% Utilization-machine : 100 91 NA 50 NA 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $48.66 $39.08 NA $39.08 NA $10.94 <br />Operating cost/hour : $132.37 $74.23 NA $40.57 NA - $7_47 <br />Ripper op. cost/hour : NA $0.00 NA $0.00 NA NA <br />Operator cost/hour : $24.98 $38.54 NA $38.54 NA $38.70 <br />Unit subtotals : $206.02 $151.84 NA $118.18 NA $57.10 <br />Number of units : 2 1 0 1 0 1 <br />Group subtotals : Work : $563.88 Support: $118.18 Maintenance : $57.10 <br />Total work team cost/hour : $739.16 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 4,033 LCY factor : NA volume : 4,033 LCY <br />Source of quantity take-off :Area observed that required topsoil during inspection <br />Snurce of estimated swell factor NA <br />
The URL can be used to link to this page
Your browser does not support the video tag.