My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-23_REPORT - M1985029 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1985029
>
2011-02-23_REPORT - M1985029 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:10 PM
Creation date
2/24/2011 12:48:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985029
IBM Index Class Name
REPORT
Doc Date
2/23/2011
Doc Name
Annual Report
From
Alma Placer
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A ? <br />been chipped and is also available for reclamation. The gold operation has also not prepared <br />any new reclamation other than backfilling of some previously mined areas, which are only a <br />portion of Phase 1. <br />(3) For the upcoming year, the gravel operator plans to continue mining the northern end of the <br />reserve area by digging deeper, although reserves in the area are nearly mined out. In addition, <br />the gravel operator will also utilize a portion of the stockpiled tailings from the gold operations. <br />The use of these tailings will not significantly impact the reclamation of the mined areas. <br />The gold operator plans to begin mining a portion of Phase 44 and to continue onto Phase 43, <br />42, 41, etc. The overburden and tailings from each phase will go back into the previously mined <br />phase. There is the possibility of additional new disturbance at both operations in the upcoming <br />year but this will involve a change to the post-mining land use, which is being contemplated and <br />will be submitted to the DRMS once the details are worked out. <br />(4) For the upcoming year, the gravel operator plans to salvage substitute topsoil from the <br />settling ponds and stockpile the material. Salvaged substitute soil will then be placed on this <br />area to the extent that it is excavated. The gold operator plans to begin reclamation of Phase 1, <br />Phase 2 and the 2010 mining area as the next phases are mined. <br />The gold operator will also salvage substitute topsoil from the settling ponds and stockpile this <br />material for reclamation. If grading is complete on Phasel, excavated silt (substitute topsoil) <br />may be placed directly on this area. <br />(5) The current contact for this operation is: <br />Clayton Brown Phone # (720) 881-7988 <br />Alma Placer Company <br />2040 W. Hamilton Place <br />Sheridan, Colorado 80110 <br />The check for $633 for the annual fee has been mailed in already. <br />Sincerely, <br />Clayton rown <br />Site Manager for the Alma Placer <br />cc: Craig Camozzi, Ben Miller, Ryan Ellis <br />(SOS) 781-4770 2040 W. Rasaiitos Pl sher14an. CO 80110 ls?lo@Alsnapiacsr.coan
The URL can be used to link to this page
Your browser does not support the video tag.