My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-15_INSPECTION - M2010058
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2010058
>
2011-02-15_INSPECTION - M2010058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:02 PM
Creation date
2/22/2011 1:16:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010058
IBM Index Class Name
INSPECTION
Doc Date
2/15/2011
Doc Name
Inspection report
From
DRMS
To
Lafarge West, Inc.
Inspection Date
2/10/2011
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 002 State :Colorado Permit/job# M--2010-058 <br />Date : 0211412011 County : Garfield Abbreviation :none <br />User : DMC Site :Cerise Mine Filename :M058-002 <br />Agency or organization name: DRMS <br />Permit or other job action : Preop <br />Task description : Placement of reclamation fill <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series ll - 8U (2005) Horsepower : 310 <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2 : NA <br /> Data source: <br />(CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $39.08 NA <br /> Operating cost/hour : $81.14 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $158.75 Total fleet cost/hour : $158.75 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 609,000 LCY factor : NA volume : 609,000 LCY <br />Source of estimated volume :Exhibit L <br />Source of estimated swell factor : NA - <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : <br />_ 135 feet <br />_ Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 747-8 LCY/hr Dozing method : 1.00 (gen.) <br /> <br />M <br />t <br />i <br />l <br />i Visibility : 1.00 (avg.) <br />a <br />er <br />a <br />cons <br />stency description : Job efficiency : 0.83 (1shift/day) <br />Loose stockpile Spoil pile :- 0 <br />80 (f <br />d <br />t <br /> . n <br />-r <br />) <br /> Push gradient : 0.67 (Cat HB) <br />Average push gradient : 15.00 % (pos) Altitude : 1.00 (C at HB) <br />Average site altitude : 6,300 feet Material weight : 1.44 (user) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 0.57 <br />Weight description : <br />USER-PROVIDED WEIGHT DATA Adjusted unit production : 428 <br />10 LCY/h <br /> . r <br /> Adjusted fleet production : 428.10 LCY/hr <br />JOB TIME AND COST <br />Fleet size Dozer(s) Total job time : 1422.57 Hours <br />Unit cost : $0.371 /LCY Total job cost : $225,833 <br />
The URL can be used to link to this page
Your browser does not support the video tag.