My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-15_INSPECTION - M2010058
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2010058
>
2011-02-15_INSPECTION - M2010058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:02 PM
Creation date
2/22/2011 1:16:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010058
IBM Index Class Name
INSPECTION
Doc Date
2/15/2011
Doc Name
Inspection report
From
DRMS
To
Lafarge West, Inc.
Inspection Date
2/10/2011
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name: DRMS <br />003 State : Colorado <br />0211412011 County : Garfield <br />DMC Site :Cerise Mine <br />Permit/job # : M-2010-058 <br />Abbreviation :none <br />Filename :0058-003 <br />Permit or other job action : Preop <br />Task description : Topsoil application <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />(Equipment Description <br />Scraper work team -Scraper : Cat 627G w/push-pull <br />-Push dozer:NA <br />Cost Bra <br />Support equipment -Load area <br />-Dump area <br />Koaa maintenance -Motor grader <br />-Water truck <br />hakdown : <br /> <br />Import data filename : Scraper Work Team <br />Scraper Dozer <br />scraper2 NA Support Equipment <br />Load area Dump area <br />NA NA Road Maintenance Equipment <br />Grader Water truck <br />NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $57.56 NA NA NA NA NA <br />Operating cost/hour : $144.12 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cosUhour : $24.98 NA NA NA NA NA <br />U <br />it <br />n <br />subtotals : $226.67 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 ---- <br />Group subtotals : Work : $453.33 Support: $0.00 Maintenance : 50.00 <br />Total work team cost/hour : $453.33 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 105,673 LCY factor : NA volume : 105,673 LCY <br />Source of quantity take-off :Exhibit L <br />Source of estimated swell factor : NA
The URL can be used to link to this page
Your browser does not support the video tag.