Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name: DRMS <br />003 State : Colorado <br />0211412011 County : Garfield <br />DMC Site :Cerise Mine <br />Permit/job # : M-2010-058 <br />Abbreviation :none <br />Filename :0058-003 <br />Permit or other job action : Preop <br />Task description : Topsoil application <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />(Equipment Description <br />Scraper work team -Scraper : Cat 627G w/push-pull <br />-Push dozer:NA <br />Cost Bra <br />Support equipment -Load area <br />-Dump area <br />Koaa maintenance -Motor grader <br />-Water truck <br />hakdown : <br /> <br />Import data filename : Scraper Work Team <br />Scraper Dozer <br />scraper2 NA Support Equipment <br />Load area Dump area <br />NA NA Road Maintenance Equipment <br />Grader Water truck <br />NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $57.56 NA NA NA NA NA <br />Operating cost/hour : $144.12 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cosUhour : $24.98 NA NA NA NA NA <br />U <br />it <br />n <br />subtotals : $226.67 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 ---- <br />Group subtotals : Work : $453.33 Support: $0.00 Maintenance : 50.00 <br />Total work team cost/hour : $453.33 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 105,673 LCY factor : NA volume : 105,673 LCY <br />Source of quantity take-off :Exhibit L <br />Source of estimated swell factor : NA