for replacement, the amount of topsoil to be hauled to the South Pit Drill Pad and respread would <br />be between 4,235 and 5,647 LCY. The topsoil material quantity in this task needs to be revised. <br />Task 021: No fertilizer was used in the reclamation at the Carbon Junction Mine, therefore the <br />costs associated with this task need to be removed. <br />Task 23a/b: The Division characterizes one section of the Carbon Junction Channel <br />reconstruction as "hard digging" and one as "easy digging". Assuming this is correct, the bucket <br />fill factor in the "easy digging section" needs to be revised, as the same bucket fill factor is used <br />for both the easy and hard digging sections. <br />Task 31a: This task needs to be removed. No topsoil was hauled to reclaim sediment pond 2. <br />Adequate and sufficient topsoil material had accumulated behind the embankment for use in the <br />reclamation. <br />Task 31d: No fertilizer was used in the reclamation at the Carbon Junction Mine, therefore the <br />costs associated with this task need to be removed. <br />Task 37a: The description of the material for final refilling of Sediment Pond 001 (50% rock, <br />50% earth) is not correct. The material used in the final reclamation was topsoil material from <br />Topsoil Stockpile #8 (as identified in the task description). The task cost needs to be revised <br />accordingly. <br />Task 37b: The Division assertion that two feet of material would need to be regraded by a D9R <br />dozer is incorrect. The placement of the material in Sediment Pond 001 by scrapers (Task 37a) <br />with the level nature of the topography would require light grading by a motor grader, at most. <br />This task should be revised to reflect this. <br />Task 37c: No fertilizer was used in the reclamation at the Carbon Junction Mine, therefore the <br />costs associated with this task need to be removed. <br />Tasks 038, 039: These tasks need to be eliminated, as the Division approved TR16 allowing <br />these topsoil stockpiles to remain in place. <br />Tasks 041: No fertilizer was used in the reclamation at the Carbon Junction Mine, therefore the <br />costs associated with this task need to be removed. Additionally, as Topsoil Stockpiles 4 and 7 <br />will remain in place and are successfully vegetated at present, there should be no costs associated <br />with revegetating them. <br />If you have any questions regarding the above observations, please contact me at your <br />convenience. We look forward to receiving a revised reclamation cost estimate. <br />Sincerely, <br />U42;p*"? <br />Michael S. Savage <br />Principal <br />c: Chi Chi Ray, Oakridge Energy