Laserfiche WebLink
Q .0f,co? COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />MINERALS PROGRAM INSPECTION REPORT <br />?1876 PHONE: (303) 866-3567 <br />* The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />MINE NAME: MINE/PROSPECTING ID#: MINERAL: COUNTY: <br />Jenkins Site M-1977-393 Sand and gravel Boulder <br />INSPECTION TYPE: INSPECTOR(S): INSP. DATE: INSP. TIME: <br />Monitoring Michael A. Cunningham January 11, 2011 10:15 <br />OPERATOR: OPERATOR REPRESENTATIVE: TYPE OF OPERATION: <br />City of Boulder Bob Crifasi and Paul Rovnak 112c - Construction Regular Operation <br />REASON FOR INSPECTION: BOND CALCULATION TYPE: BOND AMOUNT: <br />Normal I&E Program None $0.00 <br />DATE OF COMPLAINT: POST INSP. CONTACTS: JOINT INSP. AGENCY: <br />NA None None <br />WEATHER: IN TO 'S SIGNATURE: SIGNATURE DATE: <br />Clear February 4, 2011 <br />The following inspection topics were identified as having Problems or Possible Violations OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Reclamation Success <br />PROBLEM/POSSIBLE VIOLATION: Problem: Mining at the Glass Gravel Pit has been complete for over five years <br />and the Operator has failed to complete reclamation. Rule 3.1.3 states that all reclamation shall be carried to <br />completion within five years from the date the Operator informs the Division that mining is complete. <br />CORRECTIVE ACTIONS: The Operator shall complete reclamation of the site in accordance with the approved <br />Reclamation Plan by the corrective action date. The Operator shall notify the Division upon completion of <br />reclamation and shall request an inspection of the site. <br />CORRECTIVE ACTION DUE DATE: 1/11/12 <br />Page 1 of 4