My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-04_HYDROLOGY - C1981014 (3)
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981014
>
2011-02-04_HYDROLOGY - C1981014 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:29:55 PM
Creation date
2/7/2011 1:41:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
HYDROLOGY
Doc Date
2/4/2011
Doc Name
4th Quarter 2010 Sedimentation Pond Report (Emailed)
From
Energy Fuels Coal, Inc
To
DRMS
Permit Index Doc Type
Sediment Pond Inspect
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feb 04 2011 3:33PM ENERGY FUELS 7197844352 page 4 <br />02/4412011 FRI 14108 FAX 17108450077 New Elk Coal Q?DC3lODB <br />ANNUAL SEDIMENTATION POND INSF <br />CDMR Rule 4.05,9(14) and 4,06 <br />Mine: Southfield <br />NPQES ID. No.: Pond e5 <br />inspection Period: r-owth Quarter 2010 <br />Inspection Data: D em 23 2010 <br />REPORT <br />General Description or Reference to Site Plan: i <br />This sediment control pond lies north east of the main faellitlea area. I drainage from the <br />recieimed mine facilities area Is directed to this pond. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover Exceltent <br />Z). Erosion forming Gullies: Extensive <br />3). Is wave adlon causing erosion: <br />On the Upstream embankment? <br />At the principal apllMrey Inlet? <br />4). Erasion of the downstream toa of the embankment? <br />Cause of erosion can be attributed to: <br />Few Poor <br />Few None <br />Yes <br />Yes- <br />Yes <br />No '-1 <br />No <br />NO 5). Is seepage wurring through the dam? <br />Could this seepage cause potential instebillty7 <br />Yes No +O <br />PRINCIPAL SPILLWAY <br />1). is the principal spillway system to working order? <br />2). Is the inlet free of debris and restrictive materiel? <br />3). is the discharge outlet free of restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />Evaluate the severlty: Extenslve Moderate <br />Yes k- No <br />Yesjp- _ No <br />Yes„ y No <br />Yes No z-- <br />Just starting None <br />Page 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.