Laserfiche WebLink
Feb 04 2011 3:33PM ENERGY FUELS 7197844352 page 3 <br />0210612011 FRI IM 03 FAX 17198450077 NOW Elk Cost jM002f006 <br />EMERGENCY SPILLWAY <br />1). Does It appear that the emergency spillway"has discharged water <br />yes <br />3). Is erosion occurring at any aeotion of the emergency spillway? <br />Yes <br />Describe extent: <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been •urpassec <br />Yes <br />Elevaton of Water Surface: Me v <br />Elevation t top of Sediment: <br />j*-C r.0 Ad <br />OTHER OBSERVATIONS <br />SHA Quallfled Impoundment epector <br />/OZ-;23 -/Z) <br />Date <br /> <br />hate: 12123f10 <br />Inca the lest inspwUan9 <br />No <br />No cf <br />No <br />Page 2 of 2