Laserfiche WebLink
Exhibit D - Mining Plan (Rule 6.4.4) <br />It appears the Applicant submitted a Mining Plan in compliance with the requirements of Rule 6.3.3, instead <br />of Rule 6.4.3 as required for a 112 Construction Materials Permit Application. Please respond to the <br />following: <br />7. The mining plan shall supply the following information, correlated with the affected lands, map(s) and <br />timetables: <br />(a) description of the method(s) of mining to be employed in each stage of the operation as <br />related to any surface disturbance on affected lands; <br />(b) earthmoving; <br />(c) all water diversions and impoundments; and <br />(d) the size of area(s) to be worked at any one time. <br />(e) An approximate timetable to describe the mining operation. The timetable is for the purpose <br />of establishing the relationship between mining and reclamation during the different phases <br />of a mining operation. You will not be required to meet specific dates for initiation, or <br />completion of mining in a phase as may be identified in the timetable. This does not exempt <br />you from complying with the performance standards of Section 3.1. Such timetable should <br />include: <br />(i) an estimate of the periods of time which will be required for the various stages <br />or phases of the operation; <br />(ii) a description of the size and location of each area to be worked during each <br />phase; and <br />(iii) outlining the sequence in which each stage or phase of the operation will be <br />carried out. <br />(Timetables need not be separate and distinct from the mining plan, but may be incorporated <br />therein.) <br />(f) A map (in Exhibit C - Pre-Mining and Mining Plan Maps(s) of Affected Lands, Subsection 6.4.3) <br />may be used along with a narrative to present the following information: <br />(i) nature, depth and thickness of the ore body or deposit to be mined and the thickness <br />and type of overburden to be removed (may be marked "CONFIDENTIAL," as per <br />Paragraph 1.3(3)); and <br />(ii) nature of the stratum immediately beneath the material to be mined in sedimentary <br />deposits.