Laserfiche WebLink
Truck/Loader Team Work cont'd Task #: 31a sheet 2 of 2 <br />Loading Tool Cycle Time : Number of loading tool passes required to fill truck : 2 passes <br />Excavators and front shovels -machine cycle time vs. job condition rating : NA <br />- selected value within basic rating : NA <br />Track loaders - material descr.: NA <br />- cycle time elements (min.) : Load : NA <br />Maneuver : NA Dump : 0.100 <br />Wheel and track loaders - unadjusted basic loader cycle time ( load, maneuver, and duml 0.600 minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material : No adjustment - factor not applicable 0.000 (Cat HB) <br />Stockpile : Conveyor or dozer piled 10 ft. high or less 0.010 (Cat HB) <br />Truck ownership : Common ownership of trucks and loaders -0.040 (Cat HB) <br />Operation : Constant operation -0.040 (Cat HB) <br />Dump target : Nominal target 0.000 (Cat HB) <br /> Net cycle time adjustment : -0.070 minutes <br /> Adjusted loader cycle time (total time per loader pass) : 0.530 minutes <br /> Net load time per truck * : 1.060 minutes <br />Truck Cycle Time : • bulk of 1st loader cycle completed during truck exchange if adj. loader cycle time < exchange time <br />Truck exchange time **: 0.00 minutes........ Adjusted for site altitude : 0.000 minutes <br />Truck load time: 1.060 minutes........ Adjusted for site altitude : 1.060 minutes <br />Truck maneuver and dump time: 0.90 minutes........ Adjusted for site altitude : 0.900 minutes <br />"set at 0 if exchange time < adj. loader cycle time (truce: exchange completed during 1st loader cycle) <br />Truck travel (haul & return) time: Road condition : Rutted dirt, little maintenance, no water, 2" tire penetration <br />Haul route : <br />Road <br />segment # Haul distance <br />(feet) Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%) Speed <br />(feet/minute) Travel time <br />(minutes) <br />1 1,200 5.00 5.00 10.00 1068 1.147 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Keturn route : Haul time ** : 1.147 minutes <br />minutes <br />minutes <br />Loading tool unit production : 713.21 LCY/hour...... Adjusted for job efficiency : 591.96 LCY/hour <br />Truck unit production : 213.00 LCY/hour...... Adjusted for job efficiency : 176.79 LCY/hour <br />Optimal no. trucks/loading tool : 3 trucks........... Selected no. trucks/loader : 3 trucks <br /> Adjusted hourly truck team production : 530.37 LCY/hr <br /> Adjusted hourly single truck/loader team production 530.37 LCY/hr <br /> Adjusted hourly multiple truck/loader team production : 530.37 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 17.25 Hours <br />Unit cost : $0.687 !LCY Total job cost : $6,288 <br /> <br />travel time shown for each segment includes acceleration/deceleration adjustment Return time**: 0.442 <br />total haul and return time shown includes altitude adjustment Total truck cycle time : 3.549