Laserfiche WebLink
sheet 1 of 2 <br />CIIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : CDRMS <br />Task # : 31a State : Colorado Permit/job # : C-92-080 <br />Date : 1110812010 County: La Plata Abbreviation :none <br />User: TAK Site: Carbon Junction Mine Filename :C080-31a <br />Permit or other job action :Midterm Permit Review 4 <br />Task description :Haul topsoil for rill & reveg. f/stockpile #7 to pond #2 <br />HOURLY EQUIPMENT COST Shift basis : i per day <br />(Equipment Description <br />Truck/loader team -Truck : Generic 12-18 cy, 6x4 <br />-Loader : CAT 98OG (2001) <br />Support equipment -Load area :NA <br />-Dump area: NA <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA NA NA NA <br />% Utilization-machine : 100 90 NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cost/hour : $16.03 $41.36 NA NA NA NA <br />Operating cost/hour : $41.48 $45.05 NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $22.29 $38.72 NA NA NA NA <br />Unit subtotals : $79.79 $125.13 NA NA NA NA <br />Number of units : 3 1 0 0 0 0 <br />Group subtotals : Work : $364.50 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $364.50 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 6,879 8CY factor :. 1.330 volume : 9,149 LCY <br />Source of quantity take-off : P. 5-30 of rect. plan (15,000 cyds - 5163 cyds footprint) / 1.43 swell <br />Source of estimated swell factor : DRMS estimate <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : 2,900 pounds/LCY Struck volume : <br />Descr.: Decomposed rock - 50% Rock, 501% Earth Heaped volume : <br />Rated payload : 50,300 pounds Average volume : <br />Payload capacity : 17.34 LCY Adjusted volume*: <br /> Final truck volume based on number of loader passes <br /> truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections <br />Rated capacity (nom. heaped) : 7.000 LCY Truck <br />Descr.: Other - soil, boulders, roots (80 -100%) Altitude adj.: 1.000 <br />Bucket fill factor : 0.900 Job efficiency : 0.830 <br />Adjusted bucket capacity : 6.300 LCY Net correction : 0.830 <br />12.00 LCY <br />18.00 LCY <br />15.00 LCY <br />17.34 LCY <br />12.60 LCY <br />Site altitude (ft.) : 7,000 <br />Loader Source <br />1.000 (Cat HB <br />0.830 (1 shift/da, <br />0.830 <br />