My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-25_REVISION - M2005065 (14)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2005065
>
2011-01-25_REVISION - M2005065 (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:06 PM
Creation date
1/31/2011 11:06:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005065
IBM Index Class Name
REVISION
Doc Date
1/25/2011
Doc Name
Coversion application (CN-01)
From
Upper Animas Sand & Gravel
To
DRMS
Type & Sequence
CN1
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L - RECLAMATION COSTS <br />Jack Clark Jr <br />Upper Animas Sand & Gravel - January 2011 <br />Pit 1: <br />Reclamation costs will include a 4-man crew using a 950 loader, 580 <br />backhoe, and a 10-wheel dump truck. Moving and contouring topsoil and fines <br />around the Pit 1 edge will take three days. Replanting willows will take an <br />additional day. Two days will be required to prepare and plant the seeded areas. <br />This will entail broadcasting the seed and dragging the seedbeds. <br />A 4-man crew and 3 pieces of equipment will be needed for 6 days to complete <br />the reclamation costs. <br />Pit 1 Reclamation Cost Estimate: <br />Loader & Operator $40/hour $400/day <br />Backhoe & Operator $28/hour $280/day <br />Truck with Operator $40/hour $400/day <br />Extra Man $12/hour $120/day <br /> $1200/day <br />6 days X $1200/day $7200 <br />Seed & Fertilizer 850 <br />Move-in Costs 525 <br />Total Reclamation Cost $8575 <br />The access road to this pit will remain. <br />Pit 2: <br />The same 4-man crew and equipment will take 6 days to spread topsoil and <br />fines on the 3 to 1 disturbed slopes. Seeding and dragging or mulching will take <br />another 2 days.
The URL can be used to link to this page
Your browser does not support the video tag.