Laserfiche WebLink
1 to 6 months, depending on material needs. The Pit 1 Well Permit allows for a <br />yearly water use of 1,650,000 gallons. This figure includes water trapped in <br />mined sand and gravel. 1,500,000 gallons of water would be allowed for <br />processing use under the Pit 1 Well Permit. If an average sized batch plant and <br />crushing unit were brought on site, it would operate for 125 days, or roughly 4 <br />months. A crushing plant operating singly could operate year round, which is not <br />possible because of winter freeze up. <br />