Laserfiche WebLink
January 20, 2011 C-1983-059/Terror Creek Loadout JJD <br />SUPPORT FACILITIES - Rule 4.04: <br />No problems were noted with any of the coal handling structures, spur line, substation, loadout office, fuel <br />facility and material storage area. <br />TOPSOIL - Rule 4.060 ?Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; <br />Redistribution 4.06.4: <br />Half of the east side topsoil stockpile was covered in snow. The remaining half of the stockpile had a fair <br />to moderate cover of vegetation. The collection and diversion ditches were covered in snow. There were no signs <br />of erosional problems or slope stability. <br />The south half of the west side topsoil stockpile was clear of snow. The stockpile appeared to be stable and had a <br />moderate cover of grass. The collection ditch/berm was snow covered. <br />SEALING OF DRILLED HOLES AND UNDERGROUND OPENINGS - Rule 4.07 <br />RECLAMATION PLAN COMPLIANCE - Rule 4.13 <br />DOCUMENTS RECEIVED - NONE <br />OTHER (SPECIFY) <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 4