Laserfiche WebLink
scarified / ripped on no less than 18 centers parallel to contour in the application process. No <br />fertilizer or mulching will be incorporated in the re-vegetation process. <br />6.3.4(1)(d) <br />The cleaned-out portion of the pond will remain as a part of the pond as shown on Exhibit E. <br />The access road used during excavation will remain. Its existence has been in place for a <br />multitude number of years providing access to the landowner's for use / maintenance of the <br />water dam and stock pond. The road is shown on Exhibit E and is not a public road. <br />6.3.4(l)(e) <br />There will not be any waste rock dumps, underground mine openings, ditches, sediment control <br />facilities, buildings or other mining-related features built/created/developed as part of the mining <br />operation and therefore, there will not be a need for any reclamation requirements. <br />6.3.4(2) <br />The following costs are an estimate in regard to reclaiming the affected/disturbed area to include <br />disbursement of the topsoil, seeding, materials, labor and mobilization/demobilization. <br />Mobilization/Demobilization $ 860.00 <br />Revegetation / Labor $3600.00 <br />Seed $ 440.00 <br />Equipment Costs 1000.0 <br />Total 59 0 00