My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-24_PERMIT FILE - M2011007 (8)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2011007
>
2011-01-24_PERMIT FILE - M2011007 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:29:20 PM
Creation date
1/25/2011 8:09:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011007
IBM Index Class Name
PERMIT FILE
Doc Date
1/24/2011
Doc Name
New 110d Appl.- Reclamation Feasibility Report- Virginia Canyon.
From
Venture Resources
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reclamation Feasibility Report - Virginia Canyon <br />0 <br />• <br />Lower Clarissa Tunnel (Site #10) <br />Location <br />The Clarissa Tunnel is located in the mainstem of Virginia Canyon approximately 2.5 miles above <br />Clear Creek (Figures 3 and 21). The mine waste pile was sampled as site #10. Site #10 is located <br />at LAT. N390 46'02.7", LONG. W105° 32'14.6". The adit of the Clarissa Tunnel is designated as <br />water quality station DM-1. The adit has been observed to drain during wet years. No drainage was <br />observed in 2000. The estimated volume of mine waste is 2,300 cubic yards. <br />Historic Structures <br />The remains of a loadout structure is located on the waste pile. The timbered adit is intact. <br />Water Quality Impacts <br />The toe of the waste pile is being actively eroded by the stream. There is also some minor erosion <br />from road drainage that flow over the pile. The waste rock contains high concentrations of soluble <br />arsenic, copper and lead. Results from the 2:1 leachate analysis are given below. <br />Site #10 <br />• <br />pH <br />S.U. Total Acidity <br />m /I As <br />b Cd <br />b Cu <br />b Fe <br />b Mn <br />b Pb <br />b Zn <br />b <br />2.38 1900 2200 260 7500 35000 2200 10000 49000 <br />Reclamation Measures <br />The recommended reclamation measure for this site is to remove the waste rock near the stream <br />and consolidate on-site. The waste rock within 10 feet of the stream channel should be moved to <br />the main pile toward the county road. The toe of the reclaimed pile should be armored with riprap to <br />46 <br />Figure 21. Lower Clarissa Tunnel (Site #10)
The URL can be used to link to this page
Your browser does not support the video tag.