My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-24_PERMIT FILE - M2011007 (8)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2011007
>
2011-01-24_PERMIT FILE - M2011007 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:29:20 PM
Creation date
1/25/2011 8:09:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011007
IBM Index Class Name
PERMIT FILE
Doc Date
1/24/2011
Doc Name
New 110d Appl.- Reclamation Feasibility Report- Virginia Canyon.
From
Venture Resources
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reclamation Feasibility Report - Virginia Canyon <br />• <br />There may be additional water that infiltrates into the mine workings from a collapsed stope near the <br />• uppermost shaft of the Crystal mine. This stope collapsed in the road drainage ditch during the <br />spring of 1996. The stope has subsequently filled with sediments, but there may be some infiltration <br />into the mine workings. <br />Reclamation Measures <br />There are several reclamation measures that should be done at this site. The highest priority should <br />be placed upon stopping the road drainage from entering the open stope under the upper road. <br />Currently, the road crosses this stope on a bridge. A structural closure that will prevent water <br />inflows should be constructed over the stope. In addition, the road drainage at this location should <br />be improved to prevent runoff from flowing across the road onto waste pile #23. As a preventative <br />measure, it is suggested that limestone by placed in the stope to help neutralize mine drainage due <br />to infiltration of local groundwater. <br />The collapsed stope in the road below the upper shaft should be excavated, then the excavated <br />material should be mixed with fly ash and kiln dust to form a cemented plug. This should reduce <br />infiltration from the road drainage ditch. <br />If the road drainage issues are addressed, waste pile #23 should require no action. <br />Waste Pile #24 is located in an ephemeral drainage. The recommended reclamation measure is to <br />construct diversion ditches on both sides of the pile. In addition, a small catchment pond should be <br />constructed at the base to settle out erosion from incidental precipitation. <br />• <br />45
The URL can be used to link to this page
Your browser does not support the video tag.