Laserfiche WebLink
b. <br />w <br />1 <br />s! <br />January 4, 2011- "Robert Fulton" Mine Dump <br />c. Description of Remedial Action: The "Robert Fulton Reclamation Project" concerns the complete <br />removal of approximately 1,000 tons of pre-existing mine waste rock that will be sent to off-site <br />processing at the Venture Resources' I-lukill Gulch Millsite. Reclamation measures will then be <br />performed after material removal as regulated and permitted by the CO DRMS. <br />• Remediation Goal Statement: Complete removal of pre-existing waste rock and <br />reclamation of previously impacted area. <br />• See Appendix A for the mineralogical content of the mine waste, based on an SPLP lab <br />analysis. <br />• As a pH treatment, hydrated lime shall be broadcast on any areas previously impacted by <br />the removed waste rock. The lime shall be broadcast at a rate of 50 pounds per 1,000 <br />Page 7of9 <br />January 4, 2011 - "Robert Fulton" Mine Dump, taking sample for lab.