My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-08_PERMIT FILE - C1981008A (11)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2010-12-08_PERMIT FILE - C1981008A (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:43 PM
Creation date
1/21/2011 5:07:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/8/2010
Doc Name
Topsoil Handling, Stockpiling and Redistribution
Section_Exhibit Name
Section 2.05.4(2)(d) Topsoil Handling, Stockpilong and Redistribution
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Non Prime Farmlands <br />Soil suitability criteria for all non prime farmland areas west of 2700 Road are addressed in <br />Table 2.05.4(2)(d) -1 B. These areas will be stripped and replaced in a single lift of mixed topsoil. <br />Depth measurements shall be taken at the same locations as the original sample sites. The <br />topsoil salvage and replacement depth information will be kept on file at the mine office and will <br />be submitted with the Annual Topsoil Balance /Spoil Quality Report Topsoil recovery depths will <br />be adjusted if warranted by the site conditions. Sample frequency is as shown in the table for <br />each material type. <br />15.0 Topsoil Remediation Plans <br />In the event that any one soil sample result exceeds the limits, WFC will implement the topsoil <br />remediation plan below. <br />If one or more parameters fall within the unsuitable range at a given grid point, a three -part <br />mitigation plan will be implemented. <br />1. The area around a suspect hole will be sampled on a closer spacing interval in order <br />to better define the lateral extent and variability of the unsuitable material. This <br />sampling will be called the 2 "d Phase sampling and the interval is one hole per 50 feet <br />distance around the bad point in all directions for prime farmland, and one hole per <br />100 feet distance around the bad point in all directions for reclaimed irrigated <br />pastureland and dryland pasture. <br />2. If 2 nd phase sampling shows an exceedence, follow -up sampling will take place to <br />delineate the area of exceedence. Delineated areas of exceedance that are larger <br />than 0.1 acres for prime farmland, 0.25 acres for reclaimed irrigated pastureland or <br />0.50 acres for dryland pasture will be remediated. <br />Revised September 2010 (PR 06) 2.05.4(2)(d) -46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.