My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-08_PERMIT FILE - C1981008A (11)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2010-12-08_PERMIT FILE - C1981008A (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:43 PM
Creation date
1/21/2011 5:07:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/8/2010
Doc Name
Topsoil Handling, Stockpiling and Redistribution
Section_Exhibit Name
Section 2.05.4(2)(d) Topsoil Handling, Stockpilong and Redistribution
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14.0 Topsoil Suitability Criteria and Testing Plan for Reclaimed Soils <br />Prior to distribution of topsoil, all graded mined areas (on which topsoil is to be applied) will be <br />sampled to confirm spoil suitability (see Regraded Spoil Monitoring Plan in Subsection 4.0 for <br />more details). The density and physical characteristics of the replaced topsoil and upper spoil <br />will be observed. <br />The suitability criteria is required to ensure that no poor topsoil or subsoil is placed near the <br />surface of any reclaimed area and that prime farmlands are restored to strict standards for high <br />productivity. <br />Prime Farmlands <br />All replaced soils on the Morgan property will be tested according to the suitability criteria in <br />Table 2.05.4(2)(d) -1A. The WFC prime farmland soil must meet the suitability criteria outlined in <br />Table 2.05.4(2)(d) -1 B. Depth measurements shall be taken at the same locations as the <br />original sample sites. Replacement depth information shall include separate thicknesses of Lift <br />A Topsoil and Lift B Topsoil for those areas (prime farmland) where the 2 lift replacement <br />applies. This topsoil salvage and replacement depth information will be kept on file at the mine <br />office and will be submitted with the Annual Topsoil Balance /Spoil Quality Report Topsoil <br />recovery depths will be adjusted if warranted by the site conditions. Sample frequency is as <br />shown in the table for each material type. <br />As described in earlier subsections, a separate category in Table 2.05.4(2)(d) -1A has been <br />established for the eastern portion of the Morgan property, where Bench 1 material is used as <br />Bench 1 subsoil substitute. <br />Revised September 2010 (PR 06) 2.05.4(2)(d)45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.