Laserfiche WebLink
i. All this information is included in the NRCS Seed Plan. <br />ii. At the end of operations the topsoil will be replaced, mixed with manure and <br />disced. Seed will be planted at a depth of 1/2" to 3/4" with a drill space of 7" to 10". <br />iii. Refer to NRCS Seed Plan. <br />iv. The seed will be drilled with a space of 7" to 10". <br />v. No mulch needed. <br />vi. N/A <br />D. Access road will remain in use as entrance to pasture. <br />E. Land will be left free of pits, impoundments and piles of waste rock. Mobile <br />buildings will be removed. <br />7.) <br />A.) A list of estimated costs regarding mobilization and fuel, please refer to Cost <br />Calculation Sheet. <br />B.) Refer to Cost Calculation Sheet. <br />C.) Refer to Cost Calculation Sheet. <br />Exhibit G - Source of Legal Right-to-Enter <br />9.) A notarized Legal Right-to-Enter is included for resubmission. <br />Exhibit J - Proof of Mailing Notices of Permit Application <br />10.) Proof of mailing the "Notice of Permit Application" is included. <br />Exhibit L - Permanent Man-Made Structures <br />11.) N/A. There are no man-made structures within 200 feet.