My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-20_REVISION - C2009087
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2009087
>
2011-01-20_REVISION - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:29:14 PM
Creation date
1/20/2011 8:18:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
REVISION
Doc Date
1/20/2011
Doc Name
Adequacy Review
From
DRMS
To
Sage Creek Coal Company
Type & Sequence
TR1
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15. The second paragraph on page 2.05-87 references The Upper and Lower Coal Stockpile Sumps <br />(UCSS and LCSS) and list the combined capacity of 1.446 ac-ft above their respective <br />principal spillway inverts, and receive runoff from 101.8 acres, or 3.24% of the Little Grassy <br />Creek watershed. Based on the information proposed in the TR-01 application, the information <br />on approved page 2.05-87 is incorrect. Please update Upper and Lower Coal Stockpile <br />Sump information in Section 2.05.6(3) Protection of Hydrologic Balance to reflect <br />proposed information presented in the TR-01 application. <br />16. The first paragraph on Page 2.05-39 discusses the two new ponds designated as LCSS and <br />UCSS in the approved permit application constructed north of the coal handling structures. <br />This information is proposed to change through TR-01. Please revise of replace the <br />appropriate text to include information of the Upper and Lower Sumps. <br />17. The proposed Map 2.05.3-E2D Upper Sump submitted with the TR-01 application is different <br />than the already approved Map 2.05.3-E2D PECOCO POND SPILLWAY RE-DESIGN. The <br />Summary of Revisions/Additions Insertion Instructions presented with the TR-01 application <br />states that the currently approved Map 2.05.3-E2D PECOCO POND SPILLWAY RE-DESIGN <br />is to be replaced with the proposed Map 2.05.3-E2D Upper Sump. However, the PECOCO <br />POND SPILLWAY RE-DESIGN is required by Rule 2.05.6(3). Please re-number the <br />appropriate maps to ensure that the correct maps are proposed to be inserted into the <br />permit application. <br />18. The Summary of Revisions/Additions Insertion Instructions presented with the TR-01 <br />application requests the removal of Addendum D-3 from Appendix 2.05.3-E2.D. The <br />information presented in Addendum D-3 is required by Rule 4.05.9(2). Please provide <br />justification to remove this section from the approved permit application. <br />19. The proposed Appendix 2.05-E2.E provided with the TR-01 submittal, references Appendix <br />2.05.3-E2.A.1 and 2 as the location for the SEDCAD modeling and demonstrations for the <br />revised sump designs with the Emergency Spillway designs provide with the TR-01 <br />application. This information does not provide adequate information as to the Upper and <br />Lower sump designs required under Rules 4.05.6 and 4.05.9. The currently approved <br />Appendix 2.05.3-E2.E references approved Addendums 2.05.3-E2.E-1 and 2.05.3-E2.E-2 as <br />the modeling demonstrations for the 10-year and 25-year, 24-hour design storm events. Please <br />provide updated 10-year, 24-hour and 25-year, 24-hour SEDCAD demonstrations for <br />revised the Revised Upper Sump and the Revised Lower Sump proposed in the TR-01 <br />application in accordance with Rules 4.05.6(3), 4.05.6(4), 4.05.6(5), 4.05.6(6), 4.05.9(1), <br />4.05.9(2)(b), and 4.05.9(2)(c)(ii). <br />Please feel free to contact me with any questions at (303) 866-3567 ext 8134. <br />Sincerely, <br />Jason Mu is <br />Environmental Protection Specialist
The URL can be used to link to this page
Your browser does not support the video tag.