Laserfiche WebLink
amec <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: March 13, 2010 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 3/7/10 through 3/13/10 <br />Days S M T W T F S <br />Work Shifts D D D D D - <br /> - N N N N - - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 15°F to 29°F (+/-) High: 32°F to 43°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: Due to snowfall and slick haul routes through out the week, night shift operations were canceled. <br />On average, fill operations did not begin until 10:30am on dayshift due to snow removal and fill <br />preparations. <br />No work activities were performed Friday (3/12/2010) and Saturday (3/13/2010) due to Ames' Annual <br />Managers Meeting. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Stripping <br />1) VLF <br />Topsoil stripping was performed during clay excavation using one CAT D-6 dozer and one <br />CAT 330 excavator at the East Cresson Clay Borrow. Haulage of topsoil to the East Cresson <br />Clay Borrow topsoil stockpile continued using tandem-axel haul trucks. <br />B) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />C) Slope Contouring <br />1) VLF <br />Slope contouring was performed in the following areas: between stations A14+00 (+/-) and <br />A20+00 (+/-), approximately 10 to 150 feet left of centerline; between stations H4+00 (+/-) <br />VLF Weekly Report WE 03.13.10.D.doc