Laserfiche WebLink
xx -X, <br />HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis : <br />Material weight : 1,600 pounds/LCY Struck volume : 24.00 LCY <br />Material description <br />Top Soil <br />Rated payload : 75,000 pounds <br />Payload capacity : 4688 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 29.00 LCY <br />Adjusted capacity : 29.00 LCY *** <br />hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 5,930 <br /> Scraper Push dozer Source <br />Scraper loading time 1.80 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 NA (Cat HB) <br />* load time per scraper pair on push-pull models Net correction : 0.830 NA <br />Travel time : <br />Road condition description :Hard, smooth, stabilized, surfaced, watered, maintained <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 1,200 0.00 2.00 2.00 2939 0.61 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 0.61 minutes <br />Return route <br />1 1,200 0.00 2.00 2.00 2960 0.54 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />travel time for each segment is adjusted for acceleration/deceleration. Return time : 0.54 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 3.55 minutes <br />Unadjusted unit production/hour : 489.81 LCY/hour *** Adjusted for job conditions : 406.54 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 3 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 1,219.62 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 2,439.23 LCY/hour <br /> <br />JOB TIME AND COST <br />Fleet size : 2 Team(s) Total job time : 29.52 Hours <br />Unit cost : $0.840 /LCY Total job cost : $60,511 <br />