My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-04_REVISION - M1983139
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983139
>
2011-01-04_REVISION - M1983139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:23 AM
Creation date
1/6/2011 2:09:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983139
IBM Index Class Name
REVISION
Doc Date
1/4/2011
Doc Name
Notice of FW Increase
From
DRMS
To
Pioneer Sand Company, Inc.
Type & Sequence
SI1
Email Name
DB2
MR1
AHH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Agency or organization name: DRMS <br />TOP State : Colorado <br />12/30/2010 <br />DB <br />County: Jefferson <br />Site :Leyden Pit <br />Permit/job #:M-1983-139 <br />Abbreviation :none <br />Filename :M139-TOP <br />Permit or other job action : Si-1 From Feb 2010 Inspection <br />Task description :Spread topsoil <br />Scraper work team -Scraper : <br />-Push dozer: <br />Cost Bre <br />Support equipment -Load area : <br />-Dump area : <br />Road maintenance -Motor grader : <br />-Water truck : <br />ipment Description <br />637G <br />D9R - 9U (2005) <br />er Tanker, 5, 000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA dozer NA misctruk <br />% Utilization-machine : 100 NA NA 100 NA 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $96.37 NA NA $58.16 NA $24.58 <br />Operating cost/hour : $161.47 NA NA $101.59 NA $9.11 <br />Ripper op. cost/hour : NA NA NA $0.00 NA NA <br />Operator cost/hour : $38.72 NA NA $38.54 NA $38.70 <br />Unit subtotals : $296.56 NA NA $198.29 NA $72.39 <br />Number of units : 6 0 0 1 0 1 <br />Group subtotals : Work : $1,779.34 Support : $198.29 Maintenance : $72.39 <br />Total work team cost/hour : $2,050.01 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 72,000 LCY factor : NA volume : 72,000 LCY <br />Source of quantity take-off :3" depth x 176 acres estimated needing reveg <br />Source of estimated swell factor :NA <br />
The URL can be used to link to this page
Your browser does not support the video tag.