Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Agency or organization name: DRMS <br />TOP State : Colorado <br />12/30/2010 <br />DB <br />County: Jefferson <br />Site :Leyden Pit <br />Permit/job #:M-1983-139 <br />Abbreviation :none <br />Filename :M139-TOP <br />Permit or other job action : Si-1 From Feb 2010 Inspection <br />Task description :Spread topsoil <br />Scraper work team -Scraper : <br />-Push dozer: <br />Cost Bre <br />Support equipment -Load area : <br />-Dump area : <br />Road maintenance -Motor grader : <br />-Water truck : <br />ipment Description <br />637G <br />D9R - 9U (2005) <br />er Tanker, 5, 000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA dozer NA misctruk <br />% Utilization-machine : 100 NA NA 100 NA 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $96.37 NA NA $58.16 NA $24.58 <br />Operating cost/hour : $161.47 NA NA $101.59 NA $9.11 <br />Ripper op. cost/hour : NA NA NA $0.00 NA NA <br />Operator cost/hour : $38.72 NA NA $38.54 NA $38.70 <br />Unit subtotals : $296.56 NA NA $198.29 NA $72.39 <br />Number of units : 6 0 0 1 0 1 <br />Group subtotals : Work : $1,779.34 Support : $198.29 Maintenance : $72.39 <br />Total work team cost/hour : $2,050.01 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 72,000 LCY factor : NA volume : 72,000 LCY <br />Source of quantity take-off :3" depth x 176 acres estimated needing reveg <br />Source of estimated swell factor :NA <br />