Laserfiche WebLink
December 16, 2010 C-1983-059/Terror Creek Loadout JJD <br />TOPSOIL - Rule 4.060 ?Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; <br />Redistribution 4.06.4: <br />The topsoil stockpile on the east side of the loadout had a moderate vegetative cover. The topsoil signs <br />were up on the stockpile. <br />SEALING OF DRILLED HOLES AND UNDERGROUND OPENINGS - Rule 4.07 <br />RECLAMATION PLAN COMPLIANCE - Rule 4.13 <br />DOCUMENTS RECEIVED - NONE <br />OTHER (SPECIF10 <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 4