Laserfiche WebLink
• instructions was distributed to the field team. A copy of the memo also exists in <br />the Lower Administration building by the copy machine. Dwight Kinnes will <br />create a CD Rom for each drill hole inclusion in the file. <br />Core Analysis Forms <br />Each field geologist needs to complete the "Core Analysis Instruction Form" for <br />each drill hole at the end of each drilling period or at the completion of a hole to <br />account for the samples that will be sent to the laboratory. The form needs to be <br />filed out electronically with box number, sample number, thickness, sample type <br />(i.e, roof rock, coal, bone, etc.) and then given to Alex Papp for review, wherein <br />he will select the analytical tests. As part of the check, a copy of the geophysical <br />log and lithology log must also accompany the form. Alex will forward a copy of <br />the completed analysis sheet to the laboratory and keep a copy in the electronic <br />hole file. <br />Upon completion of each drilling period an inventory list of the core boxes that <br />are being shipped to the lab will be prepared containing at least the box numbers <br />and sample intervals. This list will be given to the laboratory and a copy retained <br />in the Collom file. <br />SGS will be sending the results to the attention of Dwight Kinnes at Colowyo. <br />Both a spreadsheet and an original hardcopy will be provided by the laboratory. <br />• Final Lithology reportinq <br />Core description sheets will be reviewed and initialed by the geotechnical <br />engineer. The geologist must also initial the sheet when deemed complete. <br />Coal seams will be reconciled with the geophysical log by the geologist and the <br />depth adjustments placed on the core description sheet. The geologist is also <br />responsible in providing a log adjusted description for the rotary portion of holes. <br />The reconciled lithology data is then provided to Dwight Kinnes for entrance into <br />the database. <br />Drill Hole Database <br />Dwight Kinnes will organize data entry of the logs. The Access drill hole <br />database is located in the CCC_COLLOM project area. The database is located <br />at: CCC_COLLOM \Geology \DrillHoleData \dhdb.mbd <br />Double -click on the "dhdb.mdb" file to open the file. <br />You will be asked for a User ID and Password. Three sets of user id's and <br />passwords exist for the database granting different levels of access, as shown: <br />Access Level User ID Password <br />• Read /Input Only geologist geologist <br />Read /Edit Only geoedit geoedit <br />NAPROJECTS\ACTIVE PROJECTS \1159520037 RioTuvo Collo3nP­iil \DraftP—it Text Tabl. MnpPDF, \Exhibi1,\Exhibi1 611­7 - G.)I(,gy Pr.F.,ibilityR7xvlWppuulics\AppuWixF- <br />ProlmolA20oaG -logic Procedw— is kh. Page 5 of 6 <br />1/16/2009 <br />