My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-17_REVISION - C1981019 (127)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-12-17_REVISION - C1981019 (127)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:28:03 PM
Creation date
1/4/2011 10:53:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
12/17/2010
Doc Name
Exhibit 7 Item 21 Collom Project Part 2
Type & Sequence
PR3
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />(ido 1.3 Objectives <br />The objectives of site characterization are: 1) to determine the elements of the hydrologic <br />regime including surface soils /geology, vadose zone and other site specific factors; 2) to <br />identify and quantify mine dewatering and slope depressurization requirements; 3) to <br />document existing groundwater and surface water quality in the area, 4) to document <br />geochemical conditions of the coal and spoils that could affect groundwater quality and 4) <br />to determine potential impacts to the hydrologic regime during and after mining. <br />The activities to be conducted include: <br />• Characterization of the groundwater flow regime, including: <br />- identification of permeable and water - bearing units, <br />- quantification of potentiometric surfaces for each significant unit, <br />- estimation of permeabilities, and <br />- documentation of pre- mining water quality. <br />• Characterization of the surface water flow regime, including: <br />- verification of previous stream characterizations, <br />- quantification and characterization of stream flows, and <br />- documentation of pre- mining water quality. <br />C <br />• Characterization of the geochemical conditions, including: <br />- documentation of the pre- mining geochemical environment, and <br />- identification of materials that may adversely affect post mining water <br />quality. <br />Appendix A includes detailed Standard Operating Procedures (SOP's) for the following <br />activities: <br />• water level measurement (WMSOP -1); <br />• measurement of field parameters (WMSOP -2); <br />• surface water, groundwater, and soils sampling (WMSOP -3, WMSOP -4, <br />WMSOP -5 & WMSOP-6); <br />• collection of field blank and field duplicate samples (WMSOP -7); <br />• sample packaging and shipping (WMSOP -8); <br />• equipment decontamination (WMSOP -9); <br />• cleaning procedure and conditions for re -use of sample bottles (WMSOP -10); <br />• monitoring well construction (WMSOP -11); <br />• hydrologic testing (WMSOP -13). <br />2572 -R1 <br />Colowyo Coal Company, L.P. <br />Water Management Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.