My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-17_REVISION - C1981019 (127)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-12-17_REVISION - C1981019 (127)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:28:03 PM
Creation date
1/4/2011 10:53:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
12/17/2010
Doc Name
Exhibit 7 Item 21 Collom Project Part 2
Type & Sequence
PR3
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y., d <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />August 23, 2004 <br />C. Crellin Scott <br />Senior Environmental Engineer <br />Colowyo Coal Company L.P. <br />5731 State Highway 13 <br />Meeker, CO 81641 <br />Subject: Collom Pit/Mine Baseline Characterization Work Plan, Permit C- 1981 -019 <br />Dear Mr. Scott: <br />COLORADO <br />DIVISION OF <br />MIN <br />GEOLOGY <br />RECLAMATION -MINING <br />SAFETY .SCIENCE <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />Thank you for arranging the August 3, 2004 meeting to introduce and discuss the scope of the <br />Draft Collom Pit Work Plan for the Baseline Characterization Program, July 2004, WMC. <br />Attendees were yourself and Juan Garcia of Colowyo Coal Mine ( Colowyo); Jerry Rowe, Geoff <br />Beale, and Ursula Williams of Water Management Consultants, Inc. (WMC); and Dan <br />Hernandez, Janet Binns, Kent Gorham, Tom Kaldenbach, and myself of the Colorado Division <br />of Minerals and Geology (Division). Issues discussed pertained to groundwater, surface water, <br />and geochemical baseline conditions and data gathering to support mine permitting, to define the <br />water regimes (groundwater /alluviaUsurface), and to evaluate key hydrologic issues associated <br />with mine development. Some discussions were:expanded to consider initial permitting <br />application and operational monitoring. The Division recognizes the phased or staged approach <br />to potential future mining, and that the characterization of some baseline conditions might be <br />deferred until portions of the mining plan become more imminent. <br />Our following comments are identified with the paragraph designations of the plan. <br />2.1 Land use. <br />We suggest this paragraph be amended to include a discussion of the existence of other <br />agricultural land uses within the project area. This information may have an effect on our future <br />determination of the extent of alluvial valley floors. <br />Locations and impacts of present and future oil and gas operations, and of past and present <br />mining operations, might be included in your site condition evaluations. <br />2.6 Proposed Operation <br />1 <br />It is stated in this section that material from the 'initial box cuts will be placed as valley fill (a <br />type of excess spoil fill) in Little Collom Gulch, .and that the exact footprint of this valley fill has <br />1 • <br />Office of Office of Colorado <br />Mined 1 and RPHAmatinn e..:.. --A i.,—:.... • : r __ __: __i r.._._.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.