Laserfiche WebLink
DRAFT <br />(1,40 <br />TABLES <br />3.1 <br />CONTENTS <br />7 <br />3.2 <br />Groundwater analytes to be reported by laboratory and measured in field <br />Page <br />3.3 <br />1 INTRODUCTION <br />1 <br />3.4 <br />2 SITE CONDITIONS <br />2 <br />3.5 <br />2.1 Land Use <br />2 <br />FIGURES After <br />2.2 Climate <br />2 <br />Generalized stratigraphic column (modified from CONSOL, 1984) <br />2.3 Geology <br />2 <br />Typical monitoring well schematic: alluvium /colluvium <br />2.4 Groundwater <br />3 <br />Typical monitoring well schematic: overburden <br />2.5 Surface water <br />4 <br />Typical monitoring well schematic: F and G coal sequence <br />2.6 Proposed operation <br />4 <br />l <br />3 WORK PLAN <br />3.1 Groundwater <br />5 <br />5 <br />Typical monitoring well schematic: Trout Creek <br />3.2 Surface water hydrology <br />9 <br />3.3 Geochemistry <br />11 <br />TABLES <br />3.1 <br />Summary of groundwater monitoring wells <br />7 <br />3.2 <br />Groundwater analytes to be reported by laboratory and measured in field <br />8 <br />3.3 <br />Preliminary flume sizes for surface water monitoring sites <br />9 <br />3.4 <br />Analytes to be reported by laboratory and measured in field <br />10 <br />3.5 <br />Analytical suite from CMLRD (1982) <br />12 <br />FIGURES After <br />page <br />2.1 <br />Generalized stratigraphic column (modified from CONSOL, 1984) <br />4 <br />3.1 <br />Typical monitoring well schematic: alluvium /colluvium <br />12 <br />3.2 <br />Typical monitoring well schematic: overburden <br />12 <br />3.3 <br />Typical monitoring well schematic: F and G coal sequence <br />12 <br />3.4 <br />Typical monitoring well schematic: sandstone below G Coal sequence <br />12 <br />3.5 <br />Typical monitoring well schematic: Trout Creek <br />12 <br />PLAN <br />1 Collom Pit monitoring locations <br />El <br />2572 -R1 <br />Colowyo Coal Company, L.P. <br />Water Management Consultants <br />