Laserfiche WebLink
operator. MWCA may request a bond reduction by following the steps described in Construction Materials <br />Rules 4.14 and 4.17. The request must include description of all completed reclamation tasks, and upon the <br />Division's concurrence that the completed tasks are adequate, the bond amount will be recalculated and <br />adjusted. Please refer to Construction Materials Rules 4.14 and 4.17. <br />The Division's current decision date for this technical revision is January 14, 2011. Please provide all <br />responses to this letter before that date. Responses should include two hard copies, and addressed to me at <br />the Division's Durango field office: 691 CR 233, Room A-2, Durango, CO 81301. <br />Thank you for also sending me the equipment costs associated with carrying out parts of the reclamation <br />plan. Please let me know if you have any questions concerning items in this letter. <br />Sincerely, <br /> <br />Bob Oswald <br />Environmental Protection Specialist <br />Ec: Steve Shuey, DRMS <br />(c:\10-12 docs\mesita hill tr2 par/rco)