Laserfiche WebLink
Introduction <br />5 <br />- estimation of permeabilities, and <br />documentation of pre- mining water quality. <br />• Characterization of the surface water flow regime, including: <br />- review and update of previous stream and seep characterizations, <br />- quantification and characterization of stream flows, and <br />- documentation of pre- mining water quality. <br />Work performed to meet the objectives of the Work Plan are as follows: <br />• evaluated geologic borings conducted for coal resource and geotechnical <br />studies; <br />• installed and developed 13 bedrock and 5 valley fill monitoring wells for <br />baseline water quality data and water level data; <br />• installed 18 piezometers for water level data; <br />• conducted 27 slug and single -well pumping tests in bedrock wells and <br />cased piezometers; <br />• conducted 5 slug tests in valley fill wells; <br />C <br />• measured water levels in wells and piezometers; <br />• installed pilot dewatering well test cluster; <br />• conducted a long -term pilot dewatering test; <br />• conducted surface water and groundwater sampling; <br />• conducted spring and seep survey, gaging and water sampling; <br />• evaluated the permeability and mineralogy of the KM; <br />• developed a hydrogeologic conceptual model; <br />• developed and calibrated a 2D numerical pore pressure model to <br />evaluate slope depressurization requirements; and <br />• developed a pre - feasibility level dewatering /depressurization design. <br />1.5 Report organization <br />Sections 2 through 5 of this report describe baseline conditions related to geology <br />(Section 2), meteorology (Section 3), surface water hydrology and chemistry, including <br />springs and seeps (Section 4), and groundwater hydrology /chemistry (Section 5). <br />Sections 2 through 5 also contain detailed descriptions of the data collection programs. <br />2572 -R2 Colowyo Coal Company <br />Water Management Consultants <br />