My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-17_REVISION - C1981019 (108)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-12-17_REVISION - C1981019 (108)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:28:02 PM
Creation date
12/29/2010 4:19:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
12/17/2010
Doc Name
Rule 2.05 Operation and Reclamation Plans
Type & Sequence
PR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 2 PERMITS <br />excellent "take" is achieved at the time of seeding. In this regard, flexibility has been built into the <br />success evaluation process so that if a positive recruitment rate to the shrub population can be <br />demonstrated on Collom area revegetation, there would be no need to achieve elevated densities within a <br />modest time -frame such as the 10 -year responsibility period. <br />Colowyo makes the commitment to establish sagebrush steppe (comprised of both core and ecotonal <br />areas) on approximately 350 acres (minimum of 175 acres core) of the Collom area reclamation or as <br />otherwise agreed upon between Colowyo and CDRMS. This acreage is based on the following rationale: <br />1) identification of all Collom area disturbance post- mining acreage exhibiting slopes 10% or flatter (Map <br />19D); 2) elimination of all small, isolated, or impractical areas for targeting this community; 3) <br />implementing "banding" (alternating strips of grassland versus shrubland) procedures on large units with <br />long slopes that might otherwise lead to excessive "snowmelt" erosion; and 4) assuming 50% shrub <br />establishment success (i.e. sufficient density) on the acreage that actually receives shrub conducive <br />metrics. Please refer to Map 19D for a representation of areas that are < 10% slope at Colowyo Mine <br />according to the proposed PMT surface. Also refer to Map 46 for the location of areas to be targeted for <br />either sagebrush steppe or grazingland plant communitites. <br />Critical to the adoption of this approach is the need for Colowyo to be allowed to deviate from the plan in <br />instances where plan maps or specifications do not reflect "on- the - ground" reality, and to the contrary, <br />when opportunities for adding unplanned supplementary areas targeting shrub establishment present <br />themselves. By acceptance of this approach, Colowyo will be granted the flexibility to take advantage of <br />day -to -day opportunities to promote shrub establishment and be able to option out of planned areas if site <br />conditions prove significantly different than anticipated. Such flexibility will in no way be allowed to <br />circumvent the requirement to maintain a proper life -of -mine topsoil balance and overall plan objective to <br />improve shrub establishment. All significant deviations from plan maps and expectations will be <br />documented and submitted in the Annual Reclamation Report. In this manner, as well as documentation <br />through bond release evaluations, CDRMS will maintain authority over any such deviations. <br />Related to this flexibility and as presented in Section 4.15, Colowyo commits to woody plant density <br />success criteria (among several others) for Phase III bond release that are ecologically defensible and <br />appropriate. This commitment is in the interest of promoting the momentum of the bond release process <br />and the pursuit of a "land -use" based reclamation program. Furthermore, this commitment on the part of <br />Colowyo is based on the fact that recent experience and advancements in reclamation science now dictate <br />less stringent requirements for a 10 -year bond responsibility period. Historically, woody plant density <br />success criterion, developed more than 30 years ago when Colowyo began surface operations, were <br />established at too high a level over too short a time period to be consistently achievable on a large scale <br />given the technology and regulatory limitations at the time. <br />Revegetation Plan <br />Following the retopsoiling of an area, any necessary fertilization, surface preparation, berm development, <br />construction of contour furrows, and seeding of the reclamation will take place. <br />The reclamation seed mixture for areas targeting grazingland (and erosion control), as shown in Volume <br />1, Table 2.05 -7, Reclamation Seed Mixture, contains sufficient diversity for ecological stability and is <br />appropriate for reclamation areas in the Collom area. The seed mixture contains a variety of grasses, <br />forbs and shrub species well adapted to the soil and moisture conditions found at Colowyo. The diverse <br />seed mixture is capable of self - selection for each reclaimed micro - habitat encountered in the reclaimed <br />areas. The diverse seed mixture is required to ensure quick erosion control for the first few years of <br />reclamation as well as obtaining the desired post- mining vegetative community with the same seasonal <br />variety and lifeform of the pre -mined area. <br />Collom — Rule 2, Page 108 Revision Date: 1/23/09 <br />Revision No.: PR -03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.