ame <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Work Element: Phase 5 CQA/ VLF <br />Date: November 28, 2009 <br />Reporting Period: 11/22/09 through 11/28/09 <br />Days S M T W T F S <br />Work Shifts - D D - - - - <br /> <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 16F to 21"F (+/-) High: 30°F to 45"F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: No work activities were performed between 11/25/2009 and 11/28/2009 in observance of the <br />Thanksgiving holiday. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />No work performed during the week. <br />B) Stripping <br />1) VLF <br />No work performed during the week. <br />C) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />D) Slope Contouring <br />1) VLF <br />Slope contouring was performed in between stations 132+00 (+/-) and 134+00 (+/-), <br />approximately 50 to 100 feet left of centerline and between stations 172+00 (+/-) and 175+00 <br />(+/-), approximately 100 to 400 feet right of centerline. Contouring was performed using <br />various CAT dozers and various CAT excavators. Material generated as the cut progressed was <br />pushed down the slope. <br />VLF Weekly Report WE 11.28.09.D.doc