Contouring was performed using various CAT dozers and CAT excavators. Material generated <br />as the cut progressed was pushed down the slope. <br />E) Overburden to Stockpile <br />1) VLF <br />No work performed during the week. <br />F) Cut to Fill <br />1) VLF <br />A CAT 385 excavator and a John Deere 850 excavator were used to excavate structural fill <br />material in the following areas: between stations F4+00 (+/-) and F9+00 (+/-), approximately 0 <br />to 150 feet right of centerline; between stations H6+00 (+/-) and 1-19+00 (+/-), approximately 0 <br />to 40 feet left of centerline; and between stations J26+00 (+/-) and J28+00 (+/-), approximately <br />150 to 175 feet right of centerline. The structural fill material was loaded into CAT 777 haul <br />trucks. <br />Prior to structural fill placement, existing fill temperature were monitored and to be or above <br />39°F. Ambient were monitored, on an hourly basis, by an AMEC representative during fill <br />placement. No fill material was placed during ambient temperatures less than 32°F. <br />Structural fill was placed in the following areas: between stations A32+00 (+/-) and A34+00 <br />(+/-), approximately 250 to 300 feet left of centerline; between stations A45+00 (+/-) and <br />A49+50 (+/-), approximately 0 to 100 feet left of centerline; between stations B4+00 (+/-) and <br />B7+00 (+/-), approximately 100 feet left of centerline to 100 feet right of centerline; between <br />stations D0+00 (+/-) and D4+50 (+/-), approximately 0 to 150 feet right of centerline; and <br />between stations F1+00 (+/-) and F2+25 (+/-), approximately 0 to 100 feet right of centerline. <br />Structural fill was placed in 18" to 24" lifts using various CAT dozers. Each lift was moisture <br />conditioned using a CAT 773 water truck (when necessary) and compacted using a 10-ton <br />vibratory smooth drum compactor, passing over the entire fill surface at least 4 times (method <br />compaction technique is applicable). <br />Structural fill (processed ore) was placed within the Phase IVa VLF between stations G2+00 <br />(+/-) and G13+00 (+/-), approximately 50 to 125 feet left of centerline and between stations <br />G16+00 (+/-) and G29+00 (+/-), approximately 50 to 125 left of centerline. Fill material <br />(processed ore) was excavated from the Phase IVc re-certification area and the old LOB haul <br />road using a CAT 375 excavator loading the material into 40-ton articulating haul trucks. <br />Structural fill was placed using a CAT D-8 dozer in 12" loose lifts and moisture conditioned as <br />needed using a CAT 773 water truck. Compaction was achieved using a 10-ton vibratory <br />smooth drum compactor. Nuclear density testing was performed with results averaging 95% of <br />maximum dry density. Moisture density relations were obtained in accordance with ASTM <br />D698-07. <br />Blast pattern drilling was performed in the following areas: between stations A6+00 (+/-) and <br />A8+50 (+/-), approximately 0 to 75 feet left of centerline; between stations 1-12+00 (+/-) and <br />H5+40 (+/-), approximately 0 to 75 feet left of centerline; between stations J1+25 (+/-) and <br />J2+25 (+/-), approximately 100 to 130 feet left of centerline; and between stations J4+50 (+/-) <br />and J5+50 (+/-), approximately 225 to 275 feet left of centerline using three track mounted <br />VLF Weekly Report WE 11.07.09.D.doc