.ddrNL <br />Jr%J <br />a <br />E;1 & En hi Ifs froa1)[a <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: November 7, 2009 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Reporting Period: 11/01/09 through 11/07/09 <br />Days S M T W T F S <br />Work Shifts D D D D D D <br /> <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 30°F to 46°F (+/-) High: 54°F to 65°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: Haulage with CAT 777 haul trucks not performed Monday (11/2/2009) <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />No work performed during the week. <br />B) Stripping <br />1) VLF <br />No work performed during the week. <br />C) Subgrade Preparation <br />1) VLF <br />Subgrade preparation was performed at the Phase IVa recertification area (approximately <br />between stations G14+00 (+/-) and G15+00 (+/-)). The existing fill in the area was shaped, <br />moisture conditioned, and compacted allowing for soil liner fill placement. The area was <br />inspected by an AMEC representative and found to be acceptable for soil liner fill placement. <br />D) Slope Contouring <br />1) VLF <br />Slope contouring was performed in the following areas: between stations E15+00 (+/-) and <br />E16+00 (+/-), approximately 75 to 100 feet right of centerline; between stations H2+00 (+/-) <br />and H4+00 (+/-), approximately 20 feet left of centerline to 20 feet right of centerline; and <br />between stations J0+50 (+/-) and J3+00 (+/-), approximately 50 to 300 right of centerline. <br />VLF Weekly Report WE 11.07.09.D.doc