My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (162)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (162)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
12/28/2010 1:49:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL. II, Appendix D, Weekly Reports, Part 6.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec,O <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Work Element: Phase 5 CQA/ VLF <br />Date: October 31, 2009 <br />Reporting Period: 10/25/09 through 10/31/09 <br />Days S M T W T F S <br />Work Shifts - D D D D - - <br /> <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 11 °F to 28°F (+/-) High: 27°F to 42°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: Heavy snowfall limited work activities on Wednesday (10/28/2009) and Thursday (10/29/2009). <br />No work was performed Friday (10/30/2009) and Saturday (10/31/2009). Haulage using the <br />CAT 777 haul trucks was suspended for the entire week. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />No work performed during the week. <br />B) Stripping <br />1) VLF <br />No work performed during the week. <br />C) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />D) Slope Contouring <br />1) VLF <br />Slope contouring was performed in the following areas: between stations E15+00 (+/-) and <br />E16+00 (+/-), approximately 75 to 100 feet right of centerline; between stations H2+00 (+/-) <br />and H4+00 (+/-), approximately 20 feet left of centerline to 20 feet right of centerline; and <br />between stations J0+50 (+/-) and J3+00 (+/-), approximately 50 to 400 right of centerline. <br />VLF Weekly Report WE 10.31.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.