amec,O <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Work Element: Phase 5 CQA/ VLF <br />Date: October 31, 2009 <br />Reporting Period: 10/25/09 through 10/31/09 <br />Days S M T W T F S <br />Work Shifts - D D D D - - <br /> <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 11 °F to 28°F (+/-) High: 27°F to 42°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: Heavy snowfall limited work activities on Wednesday (10/28/2009) and Thursday (10/29/2009). <br />No work was performed Friday (10/30/2009) and Saturday (10/31/2009). Haulage using the <br />CAT 777 haul trucks was suspended for the entire week. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />No work performed during the week. <br />B) Stripping <br />1) VLF <br />No work performed during the week. <br />C) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />D) Slope Contouring <br />1) VLF <br />Slope contouring was performed in the following areas: between stations E15+00 (+/-) and <br />E16+00 (+/-), approximately 75 to 100 feet right of centerline; between stations H2+00 (+/-) <br />and H4+00 (+/-), approximately 20 feet left of centerline to 20 feet right of centerline; and <br />between stations J0+50 (+/-) and J3+00 (+/-), approximately 50 to 400 right of centerline. <br />VLF Weekly Report WE 10.31.09.D.doc