Laserfiche WebLink
ame <br />Earth & Environmental <br />AMEC observed subgrade preparation between stations A27+00 (+/-) and A38+00 (+/-), approximately <br />50 to 500 feet left of centerline. <br />Testing Summary <br />Laboratory testing continues (Particle Size Distribution, Atterberg Limits, and Moisture-Density <br />Compaction testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No Concerns <br />Summary of Planning Items: <br />Structural fill placement for the Phase 5 VLF will continue. <br />Resume processing Soil Liner Fill at the South Cresson Clay Processing area. <br />Continue slope contouring above the East Perimeter Road. <br />Continue subgrade preparation within the VLF footprint. <br />Continue the excavation work at the planned water storage tank location. <br />Summary of Non-conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V: <br />CC&V held a Weekly Construction meeting on June 2, 2009. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />Daily Safety/Tailgate Meetings: AMEC personnel attended the Ames daily safety meeting held at <br />6:40AM prior to the start of shift. Discussions centered on safety and planned work activities. <br />AMEC: <br />John Lupo and Derek Wittwer were on site on Wednesday (6/3/2009) to review the work progress and to <br />address any issues. <br />Others: <br />None <br />Summary of Incidents/Accidents/Health & Safety Issues: <br />None <br />We trust the information provided clearly represents our findings and observations for the week ending <br />June 6, 2009. <br />Sheet 4 of 6 <br />VLF Weekly Report WE 06.06.09.D.doc