amec* <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) S. <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: June 6, 2009 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 05/31/09 through 06/06/09 <br />Days S M T W T F S <br />Work Shifts - N D D D D - <br /> - N N N N - - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 33°F to 45°F (+/-) High: 42° F to 63° F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: Work delays Monday 6/1/2009 (Day and Night) and Tuesday 6/2/2009 (Night), due to rain, hail, <br />fog, and lightning. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />Slash removal continued at the east slope of the Phase 5 VLF. The slash was hauled using 40- <br />ton haul trucks loaded by a CAT 330 excavator. Some of the clearing was performed for power <br />pole installation in the area. <br />2) VLF, PSSA Haul Road <br />No work performed during the week. <br />B) Stripping/Slope Recontouring <br />1) VLF <br />Stripping and slope recontouring for the East Perimeter Road continued during the week <br />between stations A5+00 (+/-) and A24+00 (+/-) approximately 0 to 150 feet right of centerline, <br />using a CAT D-10 dozer and one CAT 330 excavator. <br />2) VLF, PSSA Haul Road <br />No work performed during the week. <br />Sheet 1 of 6 VLF Weekly Report WE 06.06.09.D.doc