amec <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: March 28, 2009 <br />Project No.: 8420125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 03/22/09 through 03/28/09 <br />Days S M T W T F S <br />Work Shifts - D D D D - - <br /> - N N N - - - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 10° F (+/-) High: 18° F to 30° F <br />In general, the week was cold, partly cloudy to cloudy with periods of snow, and wind namely during <br />night shift work. Thursday afternoon work stopped for the remainder of the week due to heavy snow <br />making conditions dangerous due to poor visibility, ice and snow on the haul roads. <br />AMEC; CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES, Minor delays due to weather during night shift snows. Thursday afternoon, work stopped for the <br />remainder of the week due to heavy snow and poor visibility. Delays due to snow and ice on haul roads. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />1. EARTHWORKS <br />A. Clear and Grubbing <br />1. VLF <br />Ames continued clearing and grubbing activities below the East Perimeter Access <br />Road. Pioneer roads were used for access. Ames used one to two CAT 345 track <br />excavators to consolidate grubbed material for loading. Work has advanced down <br />slope to Stations E10+50(+/-) to E14+50(+/-), left 75 to 100 feet. Ames used one <br />Volvo A40D haul truck to transport the material to Pad 4 slash pile located North of <br />Ames maintenance facility. <br />Sediment Collection Pond: <br />Clearing and grubbing has been completed. <br />B. Stripping <br />1. VLF <br />No work this past week. <br />Sheet 1 of 7 <br />VLF Weekly Report WE 03.28.09.D