Laserfiche WebLink
amecl* <br />Earth & Environmental <br />• • No Activities <br />E. Subgrade Preparation <br />1. VLF <br />• No Activities <br />2. Sediment Collection Pond <br />• No Activities <br />F. SLF Processing (Material is being generated/processed for the LOB and the VLF) <br />• No Activities <br />G. Miscellaneous <br />1. No Activities <br />II. Underground Working <br />A. Drilling <br />• No Activities <br />B. Mine Shaft/Stope Remediation <br />• No Activities <br />C. Lateral/Slot Remediation <br />• • No Activities <br />III. Stormwater Management Structures <br />A. Best Management Practices (BMPs) <br />• No Activities <br />IV. VLF Geosynthetics <br />A. LLDPE Geomembrane <br />• No Activities <br />CQA ACTIVITIES: <br />SUMMARY: <br />No construction activities were performed in the VLF during the week. <br />No night shift work was performed during the week. <br />No work was performed on Saturday, January 24. Currently no work activities are planned for Saturdays <br />but Ames has indicated that Saturday will be used as a make up day in the event of delay or stoppage <br />during the current planned work periods Monday to Friday. <br />• <br />Sheet 2 of 4 VLF Weekly Report WE 01.24.09.D.doc