Laserfiche WebLink
ame <br />Earth 8 Environmental <br />• <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 Project No.: 8420125EO <br />Owner: Cripple Creek & Victor Gold Mining Co. Contractor: Ames Construction Co., Inc. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: 1/27/09 Reporting Period: 01/18/09 through 01/24/09 <br />Ambient Temperature Range (F): Lows: 17 ° to 4V Highs: 5V to 70° <br />AMEC CQA Personnel On-site through the Reporting Period (See Attachment A). <br />Days S M <br />T <br /> <br />T <br /> <br />W <br /> <br />T <br /> <br />F <br /> <br />S <br />Work Shifts D D D D D - <br /> <br />D = Day Shift N = Night Shift <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />NO CONSTRUCTION ACTIVITY ON THE VLF THIS WEEK <br />1. EARTHWORKS <br />• A. Clear and Grubbing <br />1. VLF <br />• No activities <br />2. Sediment Collection Pond <br />• No Activities. <br />B. Stripping <br />1. VLF <br />• No Activities. <br />2. Sediment Collection Pond <br />• No Activities <br />C. Waste Rock to Stockpile <br />1. VLF <br />• No Activities <br />2. Sediment Collection Pond <br />• No Activities <br />D. Cut to Fill <br />1. VLF <br />• No Activities <br />• 2. Sediment Collection Pond <br />Sheet 1 of 4 VLF Weekly Report WE 01.24.09.D.doc