My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (125)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (125)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
12/23/2010 12:56:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL. II, Appendix D, Weekly Reports, Part 1
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />Earth & Environmental <br />Summarv of SLF Drocessina <br />Location This Week Cumulative Comments <br /> tons tons <br />LOB Plant (Dump 5) 3,090 20,599 The plant has been down or limited <br /> production this week. <br />Totals 3,090 20,599 <br />G. Miscellaneous <br />• Continuing work on the 9775 VLF bench widening on the existing ore heap for the <br />planned relocation of the existing solution lines. <br />II. Underground Working <br />A. Drilling <br />• No work this week. <br />B. Mine Shaft/Stope Remediation <br />• No Activities <br />C. Lateral/Slot Remediation <br />• No Activities <br />III. Stormwater Management Structures <br />A. Control Structures <br />• No Activities <br />IV. VLF Geosynthetics <br />A. LLDPE Geomembrane 80 mil and 100 mil <br />• Poly-Flex has sent a pre-certification list for 100mil LLDPE for 28 rolls and 80mil <br />LLDPE for 5 rolls. Mil Certifications were obtained by TRI of Texas during the <br />manufacturing of the liner and all tests performed were in Project compliance <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. Field observations within the northwest portion of the VLF included stripping <br />of all frozen and unsuitable materials and placement of structural fill by method spec. as outlined in the <br />Project Documents. <br />Clay processing was intermittent due to mechanical problems with the clay plant located in Dump 5. <br />The materials processing plant located in Arequa Process Area has been in production all week. The <br />screening plant is producing 5 different materials types. <br />No work on Friday due to Ames annual Managers Meeting. Make-up day will be Saturday, March 14`" <br />Work has continued on the 9775 bench widening for the future re-location of the existing solution piping. <br />AMEC worked Friday day in the laboratory and office. <br />Sheet 3 of 9 VLF Weekly Report WE 03.07.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.