My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (125)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (125)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
12/23/2010 12:56:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL. II, Appendix D, Weekly Reports, Part 1
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec' <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Project No.: 8420125EO <br />Contractor: Ames Construction Co., Inc. <br />Date: 3/07/09 Reporting Period: 03/01/09 through 03/07/09 <br />Days S M T W T F S <br />Work Shifts - D D D D D - <br /> - N N N - - - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 15°to 31° High: 33°to 38° <br />AMES, No work delays due to weather this week. AMES did not work Thursday or Friday night shifts <br />and did not work Friday day shift due to a company wide training held in Denver Co. <br />AMEC CQA Personnel On-site through the Reporting Period (See Attachment A). <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />1. EARTHWORKS <br />A. Clear and Grubbing <br />1. VLF <br />• Ames worked during the week continued clearing and grubbing activities along <br />the East Perimeter Access Road. Pioneer roads were used for access. Ames <br />used one to two excavators to consolidate grubbed material for loading. <br />• Ames used the Volvo A40D trucks to transport the material to Pad 4 slash pile <br />located North of Ames maintenance facility. <br />• Sediment Collection Pond: No activities. <br />B. Stripping <br />1. VLF <br />• The existing topsoil located near the northwest edge of the Phase 5 VLF. This <br />area is identified by the Contractor as the "substation" area. No work this <br />week. <br />• No additional stripping this week. <br />2. Sediment Collection Pond <br />• No activities. <br />Sheet 1 of 9 <br />VLF Weekly Report WE 03.07.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.