Laserfiche WebLink
amec' <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Project No.: 8420125EO <br />Contractor: Ames Construction Co., Inc. <br />Date: 3/07/09 Reporting Period: 03/01/09 through 03/07/09 <br />Days S M T W T F S <br />Work Shifts - D D D D D - <br /> - N N N - - - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 15°to 31° High: 33°to 38° <br />AMES, No work delays due to weather this week. AMES did not work Thursday or Friday night shifts <br />and did not work Friday day shift due to a company wide training held in Denver Co. <br />AMEC CQA Personnel On-site through the Reporting Period (See Attachment A). <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />1. EARTHWORKS <br />A. Clear and Grubbing <br />1. VLF <br />• Ames worked during the week continued clearing and grubbing activities along <br />the East Perimeter Access Road. Pioneer roads were used for access. Ames <br />used one to two excavators to consolidate grubbed material for loading. <br />• Ames used the Volvo A40D trucks to transport the material to Pad 4 slash pile <br />located North of Ames maintenance facility. <br />• Sediment Collection Pond: No activities. <br />B. Stripping <br />1. VLF <br />• The existing topsoil located near the northwest edge of the Phase 5 VLF. This <br />area is identified by the Contractor as the "substation" area. No work this <br />week. <br />• No additional stripping this week. <br />2. Sediment Collection Pond <br />• No activities. <br />Sheet 1 of 9 <br />VLF Weekly Report WE 03.07.09.D.doc