Laserfiche WebLink
ame <br />Earth & Environmental <br />• • No Activities <br />2. Sediment Collection Pond <br />• No Activities <br />E. Subgrade Preparation <br />1. VLF <br />• No Activities <br />2. Sediment Collection Pond <br />• No Activities <br />F. SLF Processing (Material is being generated/processed for the LOB and the VLF) <br />• No Activities <br />G. Miscellaneous <br />1. No Activities <br />II. Underground Working <br />A. Drilling <br />• No Activities <br />B. Mine Shaft/Stope Remediation <br />• No Activities <br />C. Lateral/Slot Remediation <br />• <br />• No Activities <br />III. Stormwater Management Structures <br />A. Control Structures <br />• No Activities <br />IV. VLF Geosynthetics <br />A. LLDPE Geomembrane <br />• No Activities <br />CQA ACTIVITIES: <br />SUMMARY: <br />Derek Wittwer and Joe Hickey arrived on site from Denver, CO at 10:OOAM on January 13, 2009. After <br />attending the weekly construction meeting a site tour was attended with Thomas Sheppard (CC&V). Site <br />mobilization, including site office, and facilities was the primary function through the week. <br />No night shift work was performed during the week. <br />No work was performed on Saturday, January 17. Currently no work activities are planned for Saturdays <br />but Ames has indicated that Saturday will be used as a make up day in the event of delay or stoppage <br />during the current planned work periods Monday to Friday. <br />• <br />Sheet 2 of 4 VLF Weekly Report WE 0 l .17.09.D.doc