My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (125)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (125)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
12/23/2010 12:56:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL. II, Appendix D, Weekly Reports, Part 1
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame <br />Earth & Environmental <br />• • No Activities <br />2. Sediment Collection Pond <br />• No Activities <br />E. Subgrade Preparation <br />1. VLF <br />• No Activities <br />2. Sediment Collection Pond <br />• No Activities <br />F. SLF Processing (Material is being generated/processed for the LOB and the VLF) <br />• No Activities <br />G. Miscellaneous <br />1. No Activities <br />II. Underground Working <br />A. Drilling <br />• No Activities <br />B. Mine Shaft/Stope Remediation <br />• No Activities <br />C. Lateral/Slot Remediation <br />• <br />• No Activities <br />III. Stormwater Management Structures <br />A. Control Structures <br />• No Activities <br />IV. VLF Geosynthetics <br />A. LLDPE Geomembrane <br />• No Activities <br />CQA ACTIVITIES: <br />SUMMARY: <br />Derek Wittwer and Joe Hickey arrived on site from Denver, CO at 10:OOAM on January 13, 2009. After <br />attending the weekly construction meeting a site tour was attended with Thomas Sheppard (CC&V). Site <br />mobilization, including site office, and facilities was the primary function through the week. <br />No night shift work was performed during the week. <br />No work was performed on Saturday, January 17. Currently no work activities are planned for Saturdays <br />but Ames has indicated that Saturday will be used as a make up day in the event of delay or stoppage <br />during the current planned work periods Monday to Friday. <br />• <br />Sheet 2 of 4 VLF Weekly Report WE 0 l .17.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.