Laserfiche WebLink
amec-0 <br />Earth & Environmental <br />• VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 Project No.: 8420125EO <br />Owner: Cripple Creek & Victor Gold Mining Co. Contractor: Ames Construction Co., Inc. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: 1/20/09 <br />Reporting Period: 01/11/09 through 01/17/09 <br />Days S M T W T F S <br />Work Shifts - D D D D - <br /> <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Lows: 18 'to 28° Highs: 28° to 51° <br />AMEC CQA Personnel On-site through the Reporting Period (See Attachment A). <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />• NO CONSTRUCTION ACTIVITY ON THE VLF THIS WEEK <br />1. EARTHWORKS <br />A. Clear and Grubbing <br />1. VLF <br />• No activities <br />2. Sediment Collection Pond <br />• No Activities. <br />B. Stripping <br />1. VLF <br />• No Activities. <br />2. Sediment Collection Pond <br />• No Activities <br />C. Waste Rock to Stockpile <br />1. VLF <br />• No Activities <br />2. Sediment Collection Pond <br />• No Activities <br />D. Cut to Fill <br />• 1. VLF <br />Sheet 1 of 4 VLF Weekly Report WE 01.17.09.D.doc