My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (125)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (125)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
12/23/2010 12:56:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL. II, Appendix D, Weekly Reports, Part 1
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame <br />Earth & Environmental <br />• CQA ACTIVITIES: <br />SUMMARY: <br />• The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. Field observation included removal of the existing topsoil stockpile near <br />the northwest portion of the VLF. In addition, observation of the drilling began on February 5, 2009 <br />to delineate the extent of underground mine workings located beneath the sediment collection pond. <br />No night shift work was performed during the week. <br />No work was performed on Saturday, February 7. Currently no work activities are planned for Saturdays <br />but Ames has indicated that Saturday will be used as a make up day in the event of delay or stoppage <br />during the current planned work periods Monday to Friday. <br />I. Testing Summary <br />No testing was performed at this time. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />None noted <br />• Summary of Non-conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V. <br />CC&V held a Weekly Contractors' meeting on February 3, 2009. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: None <br />Amec: None <br />Others: None <br />Daily Safety/Tailgate Meetings: <br />AMEC personnel attended Ames daily safety meetings being held prior to the start of day shift. <br />Summary of Incidents/Accidents/Health & Safety Issues <br />None noted. <br />• CQA Monitor: Alfonso Frias Date: 02/10/09 <br />Approved By: Date: <br />Sheet 3 of 7 VLF Weekly Report WE 02.07.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.