Laserfiche WebLink
ame <br />Earth & Environmental <br />• D. Cut to Fill <br />1. VLF <br />• No Activities <br />2. Sediment Collection Pond <br />• No Activities <br />E. Subgrade Preparation <br />1. VLF <br />• No Activities <br />2. Sediment Collection Pond <br />• No Activities <br />F. SLF Processing (Material is being generated/processed for the LOB and the VLF) <br />• Production of the SLF material continued at the clay plant throughout the week. <br />Approximately 4967 tons of clay was processed throughout the week as <br />provided by Ames in their daily reports. <br />G. Miscellaneous <br />1. No Activities <br />II. Underground Working <br />• A. Drilling <br />• The Drillers (Rock Breakers) mobilized to site on February 4, 2009. They began <br />drilling on February 5, 2009 in the sediment collection pond to delineate the extent of <br />the underground mine workings. Based on the driller's daily reports, approximately <br />1550' was drilled throughout the week (see attached photos). <br />B. Mine Shaft/Stope Remediation <br />• No Activities <br />C. Lateral/Slot Remediation <br />• No Activities <br />111. Stormwater Management Structures <br />A. Best Management Practices (BMPs) <br />• No Activities <br />IV. VLF Geosynthetics <br />A. LLDPE Geomembrane <br />• No Activities <br />• <br />Sheet 2 of 7 VLF Weekly Report WE 02.07.09.D.doc