Laserfiche WebLink
WITHIN 180 DAYS OF PERMIT REVISION NO. 1 APPROVAL AND PRIOR TO CONSTRUCTION OF POND 14, <br />THE APPLICANT SHALL SUBMIT A TECHNICAL REVISION TO THE YOAST PERMIT WHICH DEMONSTRATES <br />THAT POND 14 EMBANKMENT HAS A MINIMUM SAFETY FACTOR OF 1.5. THE STRENGTHS OF MATERIALS <br />MUST BE DETERMINED, AND AN ANALYSIS WITH SITE-SPECIFIC STRENGTH PARAMETERS DEMONSTRATE A <br />MINIMUM FACTOR OF SAFETY OF 1.5. <br />Status: Complied with 0710512000. Stipulation No. 15 has been satisfied by approval of TR-14. <br />STIPULATION NO. 16 <br />THE CONSTRUCTION OF HA UL ROAD "D " BETWEEN POND 012 AND HA UL ROAD "B " EXTENSION HAS <br />BEEN COMPLETED. AS SOON AS WEATHER PERMITS BUT NO LATER THAN JULY 1, 2001, SENECA COAL <br />COMPANY MUST SUBMIT THE AS-BUILT CERTIFICATION FOR THE PORTION OF HAUL ROAD "D" THAT <br />HAS BEEN CONSTRUCTED TO DATE. <br />Status: Complied with 0713012001. Stipulation No. 16 has been satisfied by approval of TR-17. <br />STIPULATION NO. 17 <br />SCC WILL SUBMIT 3 COPIES OF PAGE 16, TABLE 22-5, VOLUMEX, TAB 22 FOR FIELD MINOR REVISION <br />#17 BYAPRIL 18, 2002. <br />Status: Complied with 0312112002. Stipulation No. 17 has been satisfied by approval of MR-17. <br />STIPULATIONNO, 18 <br />BY NO LATER THAN MARCH 15, 2007, THE OPERATOR WILL SUBMIT A COMPLETE TECHNICAL REVISION <br />APPLICATION THAT WILL DESCRIBE THE HISTORIC RECORD BASED HERBACEOUS PRODUCTION STANDARD <br />FOR NON-CROPLAND PORTIONS OF THE HAUL ROAD CORRIDOR, PURSUANT TO RULE 4.15.7(2)(D)(V), <br />INCLUDING ALL APPLICABLE SUPPORTING DOCUMENTATION (OR REFERENCE TO SUCH DOCUMENTATION <br />IF PREVIOUSLY SUBMITTED TO THE DIVISION). FURTHER DATA COLLECTION PROPOSED (IF ANY TO <br />ESTABLISH THE HISTORIC RECORD STANDARD WILL ALSO BE DEFINED IN THE APPLICATION. <br />ALTERNATIVELY, THE APPLICATION WILL PROVIDE A PLAN AND APPLICABLE SUPPORTING <br />DOCUMENTATION FOR HERBACEOUS PRODUCTION SUCCESS COMPARISON THAT WILL COMPLY WITH <br />RULES 4.15.7(2)(D)(I) OR (IV). <br />Status: Complied with 0411212007. Stipulation No. 18 has been satisfied by submittal of TR-31. <br />STIPULATION NO. 19 <br />DOCUMENTATION OF OFFICE OF STATE ENGINEER APPROVAL OF PONDS 010, 013, AND 014 AS <br />PERMANENT IMPOUNDMENTS, ALONG WITH DOCUMENTATION THAT ANY NECESSARY WATER RIGHTS <br />HAVE BEEN OBTAINED FOR THE IMPOUNDMENTS, WILL BE PROVIDED TO THE DIVISION PRIOR TO FINAL <br />BOND RELEASE APPLICATION FOR THE IMPOUNDMENTS. <br />Yoast Mine 6 December 15, 2010