My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-14_GENERAL DOCUMENTS - C1994082
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1994082
>
2010-12-14_GENERAL DOCUMENTS - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 3:32:00 PM
Creation date
12/17/2010 1:15:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
General Documents
Doc Date
12/14/2010
Doc Name
Proposed Decision & Findings of Compliance for RN3
Permit Index Doc Type
Findings
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RIGHT TO MODIFY THE PERMIT, WHEN APPROPRIATE, IN ORDER TO RESOLVE CONFLICTS BETWEEN THE <br />PERMIT REQUIREMENTS AND THE REQUIREMENTS OF OTHER LAWS, RULES, AND REGULATIONS <br />ADMINISTERED BY THE SECRETARY OF THE INTERIOR. <br />Status: Complied with. Stipulation No. 10 has been satisfied by the approval of the federal <br />mining plan on 09106195. <br />STIPULATION NO. H <br />PRIOR TO INSTALLATION OF DRAGLINE DEADHEAD ROAD PERMANENT DRAINAGE, SENECA COAL <br />COMPANY SHALL CONSTRUCT KEY CUTS ABOVE AND BELOW THE RECONSTRUCTED DRAINAGE TO THE <br />MINIMUM SPECIFICATIONS OF 3 ' DEEP AND 5 ' ACROSS THE WIDTH OF THE CHANNEL. SCC SHALL ALSO <br />PLACE A GRANULAR FILTER LAYER OR GEOTEXTILE FILTER FABRIC IN THE ENTIRE RECONSTRUCTED <br />DRAINAGE CHANNEL PRIOR TO PLACEMENT OF THE ROCK RIPRAP. <br />Status: Complied with. Stipulation No. 11 was satisfied by construction of the required drainage <br />amendments and approved on inspection on 01115197. <br />STIPULATION NO. 12 <br />SENECA COAL COMPANY SHALL SUBMIT A RECLAMATION PLAN IN THE FORM OF A REVISION FOR THE <br />TOPSOIL PILES LOCATED AT THE YOAST MINE ENTRANCE HA UL ROAD BY OCTOBER 15, 1996. <br />Status: Complied with 05130197. This stipulation was satisfied by the use of the topsoil and <br />elimination of the pile in February 1997, and by approval of TR-05. <br />STIPULATION NO. 13 <br />SENECA COAL COMPANY SHALL PROVIDE PROOF OF RESOLUTION OF KENTUCKY CIVIL PENALTY <br />VIOLATIONS AND BOND FORFEITURE ASSOCIATED WITH PERMIT 8980140 AS SOON AS IT BECOMES <br />AVAILABLE. <br />Status: Complied with 10/1712002. Kentucky violations associated with permit #8980140 were <br />resolved and the stipulation was terminated. <br />STIPULATION NO. 14 <br />APPROVAL OF MINOR REVISION NO 13 FOR THE YOAST MINE IS CONDITIONED UPON THE RESOLUTION <br />WEST VIRGINIA CESSATION ORDER NO. 13 ASSOCIATED WITH PERMIT NUMBER E012500 FOR THE <br />MARTINKA COAL COMPANY. PROOF OF RESOLUTION SHOULD BE SUBMITTED TO THE COLORADO <br />DIVISION OF MINERALS AND GEOLOGY AS SOON AS IT BECOMES AVAILABLE. <br />Status: Complied with 10/1712002. West Virginia Cessation Order No. 13 was resolved and the <br />stipulation was terminated. <br />STIPULATION NO. 15 <br />Yoast Mine 5 December 15, 2010
The URL can be used to link to this page
Your browser does not support the video tag.